Valve Relocation Clash Check
Dimensional survey and clash checking for the lifting and relocation of valve HV-520728 along the path of the temporary lifting frame. The valve was to be lifted, moved south then east to the newly installed water injection manifold on the Deep Water Guneshli platform in the Caspian Sea.
Deliverables Included
- Detailed survey report.
- Clash plots.
The work was completed without incident and within schedule.