• Call Us: +(321) 48 659 779
    Mail@Industrypress.com

  • View All
  • Fabrication
  • Case Studies
  • Engineering
  • Survey

Fabrication and Installation of Hydraulic Pipework for DBA 90t AHC Winch

Fabrication

Engineering

Case Studies

Survey

Case Studies

BOP Control Unit Upgrades

Engineering

Mobile equipment transportation frames to DNV 2.7-1

Engineering

New Production Flowlines

Engineering

Radiator Support Platform

Engineering

Replacement of Scaffold Access Platforms

Engineering

Sewage System Upgrades

Engineering

Air Bleed Ducting Upgrade

Survey

Pipe Lay Barge Engine Room / Firing Line

Survey

New Presidential Terminal

Survey

Valve Relocation Clash Check

Survey

TAR works in Georgia

Fabrication